Sale!

MasterVision Gridded Magnetic Porcelain Dry Erase Project Planning Board, 1″ x 2″ Cells, 72″ x 48″, White Surface, Satin Aluminum Frame (BVCCR1230830)

Original price was: $1,199.71.Current price is: $657.49.

  • Pale gray grid lines make planning easy.
  • Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
  • Easy four-corner mounting system, hardware included.

Availability: 23 in stock

- +
SKU: BVCCR1230830 Category: Tags: , , , Brand:

Magnetic porcelain Platinum Pure White dry erase surface is recommended for extensive use.

Feature

  • Pale gray grid lines make planning easy.
  • Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
  • Easy four-corner mounting system, hardware included.

Item Specifications

Global Product TypePreformatted Dry Erase Boards
Board Surface Type(s)Dry Erase
Magnetic Board SurfaceYes
Surface MaterialPorcelain
Surface ColorWhite
Dedicated Projection ScreenNo
Flipchart Mounting SystemNo
Frame MaterialAluminum
Frame Color/FinishSatin
Board Width72"
Board Height48"
Preformatted Board SurfaceYes
Preformatted Surface DetailsProject Planning & Tracking Spreadsheet (1" x 2" Cells)
Supports Custom Surface FormattingNo
Grid Columns23
Grid Rows45
Mounting DetailsFour-Corner Wall-Mount System (Included)
Package IncludesAccessory Tray/Rail
Package IncludesMounting Kit
Compliance StandardsISO 9001-2008
Pre-Consumer Recycled Content Percent0%
Post-Consumer Recycled Content Percent0%
Total Recycled Content Percent0%
SKU GroupMasterVision® Gridded Magnetic Porcelain Dry Erase Planning Board

Shipping Information

Item Weight (lbs)37.4
Item Width (in)49.41
Item Height (in)1.38
Item Length (in)77.17
Unit of MeasureEA
Sold ByEA
Ships via UPSN
Carton Qty1
Carton Width (in)49.41
Carton Length (in)77.17
Carton Height (in)1.38
Carton Weight (lbs)37.4
Assembly RequiredN

Compliance & Regulatory

Considered GreenN
Made of Recycled MaterialsN
EPA CPG CompliantN
EPA List NN
EPA RegistrationN
Prop 65 RequiredN
Prop 65 Label RequiredN
Safety Data Sheet (MSDS)N
Pesticide ProductN
TSCA 6(h)N
TSCA 12(b)N
FDA CertifiedN
Assembly RequiredN
Marketplace RestrictionNORST

Manufacturer & Product IDs

BrandBI-SILQUE VISUAL COMMUNICATION PRODUCTS INC
Manufacturer Part NoCR1230830
GTIN (UPC)00560375054270
GTIN Carton15603750542701
UPC Retail560375054270
UPC Carton15603750542701
Country of OriginPT
UNSPSC Number44111901

Reviews

There are no reviews yet.

Be the first to review “MasterVision Gridded Magnetic Porcelain Dry Erase Project Planning Board, 1″ x 2″ Cells, 72″ x 48″, White Surface, Satin Aluminum Frame (BVCCR1230830)”

Your email address will not be published. Required fields are marked *

Shopping Cart
Scroll to Top